Google In internet In website
Latest news
About CHG
CHG qualification
Production capacity
Successful cases
Latest news
Successful cases
You are here : Home >>About CHG >> Successful cases
Changing the preload, solving the problem

   There are no problems in front of us.
The problem: Because of the incorrect preload after mounting, the blades of the wind turbine vibrated when it worked in bad weather, reduced wind turbine's life.

CHG's solution: Our technicians had a long-time technical exchange with foreign design experts of wind turbine, and then they found the relationship between preload and load moment, as a result, they solved the problem of blades vibration; prolong the life of wind turbine.

Back
 
 
South&North America:
MSN Online Status Indicator Alice
Alice@lyhgbearing.com
Europe&Oceania:
MSN Online Status Indicator Nana
lyhgwei@lyhgbearing.com
Asia,Africa&Latin America:
MSN Online Status Indicator Jean
oem@lyhgbearing.com
latest news
2010-6-23
2010-5-6
2010-4-23
more>>
Copyright © Luoyang huigong large-size bearing manufacturing Co.,Ltd.
 
在线客服
在线客服系统